SB 2565 TN Introduced
Utilities, Utility Districts - As introduced, requires each public and private electric utility and electric project developer, owner, or operator to conduct a technical assessment of certain electrical transformers to determine vulnerability to geomagnetically induced current; requires such entities to file a report on the assessment with the general assembly, governor, board of utility regulation, and the public utilities commission. - Amends TCA Title 4; Title 7 and Title 65.
A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →
Sponsor (1)
- Bowling Republican · primary
Action history (5)
- Feb 2, 2026 Introduced, Passed on First Consideration · lower
- Feb 2, 2026 Filed for introduction · lower
- Feb 5, 2026 Passed on Second Consideration, refer to Senate State and Local Government Committee · upper
- Mar 3, 2026 Placed on Senate State and Local Government Committee calendar for 3/10/2026 · lower
- Mar 10, 2026 Deferred to Summer Study · lower
Text versions (1)
Full text
The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.
Comments
Data from OpenStates. View on OpenStates →
Comments