Skip to main content
CivicGate

HCR 3015 ND
Introduced

A concurrent resolution urging the Southwest Power Pool and Midcontinent Independent System Operator to promptly and decisively act to maintain the reliability of the bulk power system by addressing market failures that have allowed capacity retirements to outpace replacement.

ND · session 69 · Assembly / House · concurrent resolution

A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →

Introduced Jan 30, 2025

Latest action (Mar 20, 2025) Filed with Secretary Of State 03/21

Sponsor (1)

9 coauthors / cosponsors

Action history (13)

  1. Jan 30, 2025 Introduced, first reading, referred Energy and Natural Resources Committee · lower
  2. Feb 13, 2025 Committee Hearing 09:00 · lower
  3. Feb 13, 2025 Reported back, do pass, placed on consent calendar 13 0 0 · lower
  4. Feb 20, 2025 Second reading, adopted yeas 87 nays 0 · lower
  5. Feb 21, 2025 Received from House · upper
  6. Feb 24, 2025 Introduced, first reading, referred Energy and Natural Resources Committee · upper
  7. Mar 13, 2025 Committee Hearing 09:30 · upper
  8. Mar 13, 2025 Reported back, do pass, place on calendar 7 0 0 · upper
  9. Mar 14, 2025 Second reading, adopted · upper
  10. Mar 17, 2025 Returned to House · lower
  11. Mar 18, 2025 Signed by President · upper
  12. Mar 20, 2025 Signed by Speaker · lower
  13. Mar 20, 2025 Filed with Secretary Of State 03/21 · lower

Full text

The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.

Comments

Comments

Loading comments…

Data from OpenStates. View on OpenStates →