HB 25-1014 CO Became Law
Increasing Efficiency Division of Water Resources
A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →
Summary
The division of water resources in the department of natural resources (division) is responsible for administering water rights and issuing water well permits, among other duties. Under current law, after having received a permit to appropriate designated groundwater or construct a well outside the boundaries of a designated groundwater basin, a permit holder is required to construct the well within one year after the date of issuance of the permit. If the well is not constructed within one year, the permit expires; except that the ground water commission (commission) in the division or the state engineer, as applicable, may grant a single one-year extension. The act extends the time frame for construction of a well to 2 years, eliminating the need for the commission or the state engineer to approve a one-year extension to the initial one-year construction time frame, except for permits issued for federally authorized water projects. The act also removes the requirement that the commission or state engineer must mail a certified letter to the permit holder before a permit can be formally expired. The act allows the commission or state engineer to reinstate an expired permit if the applicant for reinstatement of the permit can show that the well was completed in a timely manner and submits a $30 fee. Under current law, the division engineer of each water division is required to decennially present to the water court a list of water rights that meet the criteria for abandonment. The act splits this decennial abandonment process into 2 batches, grouped by water division and spaced 5 years apart, beginning with 2030 and 2035. The act maintains the requirement that the abandonment process be performed every 10 years in each water division. The act extends certain time frames relating to the well permitting process. Lastly, the act eliminates final permitting requirements for non-Denver Basin bedrock aquifer wells in the designated basins. (Note: This summary applies to this bill as enacted.)
Sponsors (4)
- Dusty Johnson Republican · primary
- Meghan Lukens Democratic · primary
- Dylan Roberts Democratic · primary
- Cleave Simpson Republican · primary
28 coauthors / cosponsors
- J. Bacon Democratic · cosponsor
- S. Bird · cosponsor
- A. Boesenecker Democratic · cosponsor
- K. Brown Democratic · cosponsor
- J. Caldwell Republican · cosponsor
- M. Duran Democratic · cosponsor
- J. Joseph Democratic · cosponsor
- R. Keltie Republican · cosponsor
- S. Lieder Democratic · cosponsor
- M. Lindsay Democratic · cosponsor
- M. Martinez Democratic · cosponsor
- T. Mauro Democratic · cosponsor
- J. McCluskie Democratic · cosponsor
- K. McCormick Democratic · cosponsor
- C. Richardson Republican · cosponsor
- L. Smith Democratic · cosponsor
- K. Stewart Democratic · cosponsor
- T. Story Democratic · cosponsor
- B. Titone Democratic · cosponsor
- J. Willford Democratic · cosponsor
- T. Winter Republican · cosponsor
- J. Amabile Democratic · cosponsor
- M. Catlin Republican · cosponsor
- L. Cutter Democratic · cosponsor
- I. Jodeh Democratic · cosponsor
- C. Kipp Democratic · cosponsor
- D. Michaelson Jenet · cosponsor
- F. Winter · cosponsor
Action history (17)
- Jun 3, 2025 Governor Signed · executive
- May 15, 2025 Sent to the Governor · executive
- May 15, 2025 Signed by the President of the Senate · upper
- May 15, 2025 Signed by the Speaker of the House · lower
- Apr 14, 2025 Senate Third Reading Passed - No Amendments · upper
- Apr 11, 2025 Senate Second Reading Special Order - Passed - No Amendments · upper
- Apr 11, 2025 Senate Committee on Appropriations Refer Unamended - Consent Calendar to Senate Committee of the Whole · upper
- Mar 27, 2025 Senate Committee on Agriculture & Natural Resources Refer Unamended to Appropriations · upper
- Mar 10, 2025 Introduced In Senate - Assigned to Agriculture & Natural Resources · upper
- Mar 5, 2025 House Third Reading Passed - No Amendments · lower
- Mar 4, 2025 House Second Reading Special Order - Passed with Amendments - Committee, Floor · lower
- Mar 4, 2025 House Committee of the Whole Amendment - Change from ----- to ----- · lower
- Mar 3, 2025 House Second Reading Special Order - Laid Over Daily - No Amendments · lower
- Mar 3, 2025 House Committee of the Whole Amendment - Change from Passed to Lost · lower
- Feb 28, 2025 House Committee on Appropriations Refer Unamended to House Committee of the Whole · lower
- Jan 27, 2025 House Committee on Agriculture, Water & Natural Resources Refer Amended to Appropriations · lower
- Jan 8, 2025 Introduced In House - Assigned to Agriculture, Water & Natural Resources · lower
Full text
The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.
Comments
Data from OpenStates. View on OpenStates →
Comments