Electric utilities; virtual power plant pilot program, Phase I Utilities.

VA · session 2026 · Assembly / House · bill

A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →

Introduced Jan 13, 2026

Latest action (Feb 18, 2026) Left in Labor and Commerce

Summary

Electric utilities; virtual power plant pilot program; Phase I Utilities. Requires Appalachian Power to petition the State Corporation Commission for approval to conduct a pilot program to evaluate methods to optimize demand through various technology applications, including the establishment of virtual power plants, by December 1, 2026. The bill requires the pilot program to evaluate electric grid capacity needs and the ability of such virtual power plants to provide grid services, including peak-shaving, during times of peak electric demand.

Sponsor (1)

Action history (6)

  1. Jan 13, 2026 Prefiled and ordered printed; Offered 01-14-2026 26103496D · lower
  2. Jan 13, 2026 Referred to Committee on Labor and Commerce · lower
  3. Jan 27, 2026 Subcommittee recommends laying on the table (5-Y 2-N) · lower
  4. Jan 28, 2026 Assigned HCL sub: Subcommittee #3 · lower
  5. Jan 29, 2026 Fiscal Impact Statement from State Corporation Commission (HB617) · lower
  6. Feb 18, 2026 Left in Labor and Commerce · lower

Text versions (2)

The published texts of this bill as it moves through the legislature. Each links to the official document on the state legislature site. Data from OpenStates.

  • Introduced · PDF
  • Introduced · HTML

Full text

The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.

Comments

Comments

Loading comments…

Data from OpenStates. View on OpenStates →