Skip to main content
CivicGate

HB 1292 ND
Introduced

Relating to electric energy conversion facility retirement, status report requirements, limitations for recovery of costs associated with electric generation built to replace a retiring electric energy conversion facility, and site reclamation and bond.

ND · session 67 · Assembly / House · bill

A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →

Introduced Jan 11, 2021

Latest action (Jan 28, 2021) Withdrawn from further consideration

Sponsors

5 coauthors / cosponsors
  • Nehring · cosponsor
  • Nathe Republican · cosponsor
  • Bell · cosponsor
  • Kreun · cosponsor
  • Patten Republican · cosponsor

Action history (3)

  1. Jan 11, 2021 Introduced, first reading, referred Energy and Natural Resources Committee · lower
  2. Jan 28, 2021 Request return from committee · lower
  3. Jan 28, 2021 Withdrawn from further consideration · lower

Text versions (1)

The published texts of this bill as it moves through the legislature. Each links to the official document on the state legislature site. Data from OpenStates.

  • INTRODUCED · PDF

Full text

The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.

Comments

Comments

Loading comments…

Data from OpenStates. View on OpenStates →