HB 1563 IN
Alternative and nuclear energy generation.
A state bill is a proposed law in a state legislature — separate from the U.S. Congress. Learn more →
Summary
Requires: (1) a public utility to notify the Indiana utility regulatory commission (commission) of the public utility's intention to retire an electric generation facility not later than 18 months before the planned retirement date; and (2) the commission to conduct a study to determine the feasibility of using the location and infrastructure of the electric generation facility for development of alternative energy generation projects, including consideration of the suitability of the location and infrastructure for use in developing a nuclear energy facility.
Sponsor (1)
- Hunter Smith Republican · author
1 coauthor / cosponsor
- Dale DeVon Republican · coauthor
Action history (3)
- Jan 21, 2025 Coauthored by Representative DeVon · lower
- Jan 21, 2025 Authored by Representative Smith H · lower
- Jan 21, 2025 First reading: referred to Committee on Utilities, Energy and Telecommunications · lower
Full text
The full text hasn’t been imported yet. CivicGate fetches it from the state legislature’s published version documents — check now.
Comments
Data from OpenStates. View on OpenStates →
Comments