S 3738 Introduced Re-checks Congress.gov for new actions and updates the bill's status, and fills in any sponsors, committees, or related bills that are missing. It does not re-pull sponsors/cosponsors/committees/related — those rarely change — and it skips all work if nothing has changed upstream, so it's cheap to click.
To amend the Infrastructure Investment and Jobs Act to reauthorize the large-scale water recycling and reuse program, to establish a Water Conveyance Improvement Program, and for other purposes.
Summary
- Reauthorizes and expands the large-scale water recycling and reuse program, extending the authorization period from 5 years to 10 years.
- Authorizes four hundred fifty million dollars for the water recycling and reuse program for fiscal years 2028 through 2032.
- Establishes a new Water Conveyance Improvement Program to provide grants for new, improved, or restored water conveyance facilities in Reclamation States.
- Requires that the Federal share of conveyance project costs not exceed 50 percent, with higher Federal cost-sharing available for multi-benefit projects providing safe drinking water or environmental benefits.
- Allows the Secretary to lead conveyance projects on request from States or public agencies and to fund non-Federal conveyance projects submitted by project proponents.
- Prioritizes multi-benefit conveyance projects that provide quantified, significant benefits such as safe drinking water for low-income communities or environmental restoration.
AI-generated plain-language summary of the bill text — neutral, and may be imperfect. See the full text below for the exact wording.
Sponsor (1)
- Sen. Padilla, Alex [D-CA] (D-CA)
Actions (4)
- Jul 29, 2026 Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably. · senate
- Mar 17, 2026 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. · senate
- Jan 29, 2026 Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S380-381) · senate
- Jan 29, 2026 Introduced in Senate
More bills on these subjects (8)
Other bills that carry the most legislative subjects in common with this one (topical discovery — distinct from the procedural related bills above).
Similar bills (6)
Bills with similar text or summary — includes reintroductions across Congresses. Ranked by semantic similarity of the bill text (computed locally); a neutral discovery aid, not a claim the bills are duplicates.
Text versions (1)
Bills are re-published as they move (Introduced → Reported → Engrossed → Enrolled …). Each stage below is a separate text; pick two to see what changed. Data from Congress.gov.
Committee action
What happened to this bill in committee — the meetings where it was considered and every recorded vote taken on it.
Meetings where this bill was on the agenda
- Business meeting to consider S.365 and H.R.1729, bills to amend the John D. Dingell, Jr. Conservation, Management, and Recreation Act to allow for additional entities to be eligible to complete the maintenance work on Bolts Ditch and the Bolts Ditch Headgate within the Holy Cross Wilderness, Colorado, S.764, to provide for the designation of certain wilderness areas, recreation management areas, and conservation areas in the State of Colorado, S.791, to establish the Justice Thurgood Marshall National Historic Site in the State of Maryland as an affiliated area of the National Park System, S.888, to designate certain land administered by the Bureau of Land Management and the Forest Service in the State of Oregon as wilderness and national recreation areas, to withdraw certain land located in Curry County and Josephine County, Oregon, from all forms of entry, appropriation, or disposal under the public land laws, location, entry, and patent under the mining laws, and operation under the mineral leasing and geothermal leasing laws, S.945, to amend the Smith River National Recreation Area Act to include certain additions to the Smith River National Recreation Area, to amend the Wild and Scenic Rivers Act to designate certain wild rivers in the State of Oregon, S.1005, to provide for conservation and economic development in the State of Nevada, S.1088, to provide that the memorial to commemorate the sacrifice and service of the women who worked on the home front to support the efforts of the United States military during World War II may be located on the National Mall, S.1195, to promote conservation, improve public land management, and provide for sensible development in Pershing County, Nevada, S.1257, to amend the Infrastructure Investment and Jobs Act to authorize the use of funds for certain additional Carey Act projects, S.1341, to amend the Colorado Wilderness Act of 1993 to add certain land to the Sarvis Creek Wilderness, S.1349, to withdraw the National Forest System land in the Ruby Mountains subdistrict of the Humboldt-Toiyabe National Forest and the National Wildlife Refuge System land in Ruby Lake National Wildlife Refuge, Elko and White Pine Counties, Nevada, from operation under the mineral leasing laws, S.1476, to amend the Wild and Scenic Rivers Act to designate certain segments of the Gila River system in the State of New Mexico as components of the National Wild and Scenic Rivers System, to provide for the transfer of administrative jurisdiction over certain Federal land in the State of New Mexico, S.1737, to designate and expand wilderness areas in Olympic National Forest in the State of Washington, and to designate certain rivers in Olympic National Forest and Olympic National Park as wild and scenic rivers, S.1777, to amend the California Desert Protection Act of 1994 to expand the boundary of Joshua Tree National Park, to redesignate the Cottonwood Visitor Center at Joshua Tree National Park as the "Dianne Feinstein Visitor Center", S.1870, to adjust the boundary of the Santa Monica Mountains National Recreation Area to include the Rim of the Valley Corridor, S.2498, to authorize the Secretary of the Interior to extend certain leases within units of the National Park System without opening the lease to bidding, S.2767 and H.R.5254, bills to authorize the Secretary of the Interior to enter into an agreement with the Gateway Arch Park Foundation to host private events in Gateway Arch National Park buildings, S.2801, to authorize the Secretary of the Interior to conduct a study to assess the suitability and feasibility of designating the Canterbury Shaker Village National Heritage Area, S.2887, to amend the National Trails System Act to designate the Route 66 National Historic Trail, S.2933, to redesignate a playground in the New River Gorge National Park and Preserve in the State of West Virginia as the "Hearts of Gold Playground: In Honor of West Virginia Children and Families Impacted by Childhood Cancer", S.2968, to ensure access to certain public land, S.3194, to authorize the Secretary of the Interior to conduct a study to assess the suitability and feasibility of designating certain land in California as the Monterey Bay National Heritage Area, S.3313 and H.R.6365, bills to require the Secretary of the Interior to issue a right-of-way for an emergency exit on certain National Park Service land in the State of Virginia, S.3409, to reaffirm that the Bureau of Reclamation retains exclusive ownership, operational control, and financial responsibility for the Lower Yellowstone Fish Bypass Channel, ensuring long-term conservation of the endangered pallid sturgeon and other native aquatic species in the Yellowstone River while protecting the Lower Yellowstone Irrigation Project and District from undue financial and operational burdens, S.3635 and H.R. 7250, bills to reauthorize the Fort Peck Reservation Rural Water System Act of 2000, S.3715 and H.R.6380, bills to establish the Chiricahua N
- Hearings to examine S.1034, to establish the Southwestern Power Administration Fund, S.1242, to authorize the Secretary of the Interior to carry out watershed pilots, S.2437 and H.R.3857, bills to amend the Snow Water Supply Forecasting Program Authorization Act, S.2753, to amend the Omnibus Public Land Management Act of 2009 to authorize certain extraordinary operation and maintenance work for urban canals of concern, S.3409, to reaffirm that the Bureau of Reclamation retains exclusive ownership, operational control, and financial responsibility for the Lower Yellowstone Fish Bypass Channel, ensuring long-term conservation of the endangered pallid sturgeon and other native aquatic species in the Yellowstone River while protecting the Lower Yellowstone Irrigation Project and District from undue financial and operational burdens, S.3500, to amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications, S.3518, to amend the Federal Power Act to address certain alterations in, and the maintenance and repair of, project works, to provide for the licensing of micro hydrokinetic energy projects, S.3635, to reauthorize the Fort Peck Reservation Rural Water System Act of 2000, S.3684, to amend the Energy Independence and Security Act of 2007 to reauthorize water power research, development, demonstration, and commercial application activities, S.3693, to extend the authorization for a large-scale water recycling and reuse grant program, S.3723, to require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water from the Missouri River to the Western Dakota Regional Water System, S.3725, to require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to expand the capacity and reach of the Lewis and Clark Rural Water System, Inc. (doing business as "Lewis & Clark Regional Water System"), in the States of Iowa, Minnesota, and South Dakota, S.3732, to amend the Water Infrastructure Improvements for the Nation Act to authorize assistance under the storage program, S.3736, to require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water to the Dakota Mainstem Regional Water System service area in the States of South Dakota, Iowa, Nebraska, and Minnesota, S.3737, to amend the Reclamation States Emergency Drought Relief Act of 1991 to provide financial and technical assistance to eligible entities for the conduct of innovative approaches to voluntary water partnership agreements among multiple water users and projects conducted by individual agricultural entities, S.3738, to amend the Infrastructure Investment and Jobs Act to reauthorize the large-scale water recycling and reuse program, to establish a Water Conveyance Improvement Program, S.3743, to direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, S.3792, to provide for the establishment of a Water Project Navigators Program, S.4040, to amend Public Law 89-108 to modify the authorization of appropriations for State and Tribal, municipal, rural, and industrial water supplies, and S.4041, to reauthorize the Cooperative Watershed Management Program.
Full text
IN THE SENATE OF THE UNITED STATES
January 29, 2026
Mr. Padilla introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To amend the Infrastructure Investment and Jobs Act to reauthorize the large-scale water recycling and reuse program, to establish a Water Conveyance Improvement Program, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the “Making Our communities Resilient through Enhancing Water for Agriculture, Technology, the Environment, and Residences Act” or the “MORE WATER Act”.
SEC. 2. REAUTHORIZATION OF LARGE-SCALE WATER RECYCLING AND REUSE PROGRAM.
Section 40905 of the Infrastructure Investment and Jobs Act (43 U.S.C. 3205) is amended—
(1) in subsection (a)—
(A) by redesignating paragraphs (1) through (4) as paragraphs (2) through (5), respectively; and
(B) by inserting before paragraph (2) (as so redesignated) the following:
“(1) Construction.—The term ‘construction’ has the meaning given the term in subsection (f) of section 4011 of the Water Infrastructure Improvements for the Nation Act (Public Law 114-322; 130 Stat. 1881), except that any reference in paragraph (2) of that subsection to ‘storage’ shall be deemed to be a reference to ‘infrastructure’.”;
(2) by striking subsection (b) and inserting the following:
“(b) Establishment.—The Secretary shall establish a program to provide grants to eligible entities on a competitive basis for the development of feasibility studies, planning, design, and construction of large-scale water recycling and reuse projects that provide substantial water supply and other benefits to the Reclamation States in accordance with this section.”;
(3) in subsection (d)(4), by striking “30” and inserting “60”;
(4) in subsection (k)—
(A) by striking “The authority” and inserting the following:
“(1) In general.—Except as provided in paragraph (2), the authority”;
(B) in paragraph (1) (as so designated), by striking “5” and inserting “10”; and
(C) by adding at the end the following:
“(2) Exception.—Paragraph (1) shall not apply to an eligible project that is under construction as of the termination date described in that paragraph.”; and
(5) by adding at the end the following:
“(l) Authorization of Appropriations.—There is authorized to be appropriated to the Secretary to provide grants for eligible projects and otherwise carry out this section $450,000,000 for the period of fiscal years 2028 through 2032.”.
SEC. 3. WATER CONVEYANCE IMPROVEMENT PROGRAM.
(a) Definitions.—In this section:
(1) Conveyance project.—The term “conveyance project” means a project for the undertaking of a new or improved water conveyance facility, or the restoration of the capacity of an existing water conveyance facility, that is located in a Reclamation State.
(2) Eligible entity.—The term “eligible entity” means—
(A) a State, Indian Tribe, municipality, irrigation district, water district, wastewater district, or any State or regional organization with statutory water or power delivery authority;
(B) a State, regional, or local authority, the members of which include 1 or more organizations that—
(i) have water or power delivery authority; or
(ii) are responsible for operating conveyance facilities as a transferred works under the reclamation laws and Bureau of Reclamation policy;
(C) an agency established under State law for the joint exercise of powers; and
(D) any combination of entities described in subparagraphs (A) through (C).
(3) Indian tribe.—The term “Indian Tribe” has the meaning given the term “Indian tribe” in section 102 of the Federally Recognized Indian Tribe List Act of 1994 (25 U.S.C. 5130).
(4) Low-income community.—The term “low-income community” has the meaning given the term in section 45D(e) of the Internal Code of 1986 (including any regulations issued under that section), including Tribal communities.
(5) Multi-benefit project.—The term “multi-benefit project” means a conveyance project that provides in the region of the conveyance project benefits that include not fewer than 1 of the following quantified, significant benefits:
(A) Safe drinking water benefits for low-income communities.
(B) Environmental benefits.
(6) Program.—The term “Program” means the Water Conveyance Improvement Program established under subsection
(b).
(7) Project proponent.—The term “project proponent” means an eligible entity that—
(A) plans and develops a non-Federal conveyance project; or
(B) operates an existing Reclamation project that is a transferred works.
(8) Project sponsor.—The term “project sponsor” means an eligible entity that contributes to the non-Federal share of a conveyance project.
(9) Reclamation project.—The term “Reclamation project” means a Bureau of Reclamation project that is owned by the United States.
(10) Reclamation state.—The term “Reclamation State” means a State or territory described in the first section of the Act of June 17, 1902 (43 U.S.C. 391; 32 Stat. 388, chapter 1093).
(11) Safe drinking water.—The term “safe drinking water” means water that meets all applicable Federal and State primary and secondary drinking water standards.
(12) Secretary.—The term “Secretary” means the Secretary of the Interior (acting through the Commissioner of Reclamation).
(13) Stakeholder.—The term “stakeholder” means—
(A) with respect to safe drinking water benefits for low-income communities—
(i)(I) an elected executive official with applicable authority or legislative body representing a low-income community (or a delegate); and
(II) any agency exercising primary enforcement responsibility for public water systems in the State in which the applicable project is located;
(ii) an Indian Tribe receiving safe drinking water benefits; or
(iii) a nonprofit organization described in section 501(c)(3) of the Internal Revenue Code of 1986 and exempt from taxation under section 501(a) of that Code with—
(I) a demonstrated track record of supporting improved access to safe drinking water for low-income communities in the region of the applicable project; and
(II) no financial conflict of interest with the project proponent or any project sponsor, except that other instances of partnership on similar projects shall not be considered a financial conflict of interest for purposes of this subclause; and
(B) with respect to environmental benefits—
(i) a nonprofit organization described in section 501(c)(3) of the Internal Revenue Code of 1986 and exempt from taxation under section 501(a) of that Code with—
(I) a demonstrated track record of supporting environmental restoration in the region of the applicable project, including species or species habitat; and
(II) no financial conflict of interest with the project proponent or any project sponsor, except that other instances of partnership on similar projects shall not be considered a financial conflict of interest for purposes of this subclause; or
(ii) an Indian Tribe, if the project is within the current or former reservation or aboriginal territory of the Indian Tribe.
(14) Water supply benefit.—The term “water supply benefit” means—
(A) an irrigation benefit;
(B) a general drinking water benefit; and
(C) operational flexibility that allows the Bureau of Reclamation to provide multiple benefits, including any of the benefits described in subparagraphs (A) and
(B).
(b) Establishment of Program.—The Secretary shall establish within the Bureau of Reclamation a Water Conveyance Improvement Program to provide authority to participate in, and provide grants to, conveyance projects.
(c) Reclamation-Led Conveyance Projects.—
(1) In general.—On the request of any State, department, agency, or subdivision of a State, or any public agency organized pursuant to State law, the Secretary may provide a grant to, and enter into an agreement on behalf of the United States for the design, study, and construction of, a conveyance project as part of a new Reclamation project, a new division of a Reclamation project, a new supplemental works on a Reclamation project, or the restoration or improvement of the capacity of an existing Reclamation project, in accordance with this subsection.
(2) Project commencement.—The construction of a conveyance project that is the subject of an agreement under this subsection shall not commence until the date on which the Secretary—
(A) determines that the conveyance project is feasible in accordance with the reclamation laws; and
(B) secures an agreement providing the funding necessary to pay the non-Federal share of the costs of the conveyance project in accordance with subsection
(e).
(3) Feasibility determination.—In determining feasibility under paragraph (2)(A), the Secretary shall review and approve a feasibility analysis provided by a project sponsor if the Secretary determines that the analysis meets Bureau of Reclamation policy relating to the preparation of a feasibility study.
(d) Non-Federal Conveyance Projects.—
(1) Proposal.—
(A) In general.—A project proponent may submit to the Secretary a proposal for the design, study, and construction of a conveyance project to be provided a grant under this section.
(B) Form.—The project proponent may submit a proposal under subparagraph (A) in the form of a completed feasibility study or any other means that provide information to support a determination that the conveyance project is eligible for a grant in accordance with paragraph (2).
(2) Requirements.—The Secretary may provide to the project proponent a grant for a conveyance project and enter into an agreement on behalf of the United States with the project proponent for the administration of the grant if—
(A) the project proponent determines, and the Secretary concurs, through the preparation of a feasibility study that is streamlined to the maximum extent practicable, that the conveyance project—
(i) is technically and financially feasible; and
(ii) is consistent with applicable Federal and State law;
(B) the project proponent has sufficient non- Federal funding available to complete the conveyance project, as determined by the Secretary;
(C) the project proponent is financially solvent, as determined by the Secretary; and
(D) not later than 60 days after the date on which the Secretary concurs with the determination under subparagraph (A) with respect to the conveyance project, the Secretary submits to Congress written notice of the determination.
(e) Cost-Sharing Requirement.—
(1) In general.—The Federal share of a conveyance project funded under this section shall not exceed 50 percent of the total cost of studies, planning, design, and construction of the conveyance project.
(2) Projects that are not multi-benefit.—The Federal share of a conveyance project other than a multi-benefit project funded under this section may be used—
(A) solely for water supply benefits; or
(B) on the approval by the Secretary and, in the case of a non-Federal conveyance project or an existing Reclamation project that is a transferred works, at the request of the project proponent, for a combination of—
(i) water supply benefits;
(ii) safe drinking water benefits for low- income communities;
(iii) environmental benefits; or
(iv) other benefits in accordance with the reclamation laws.
(3) Multi-benefit projects.—In the case of a multi-benefit project funded under this section—
(A) the Federal share of not more than 30 percent of the costs of studies, planning, design, and construction of the multi-benefit project may be used for any of the benefits described in paragraph (2); and
(B) an additional Federal share of not more than 20 percent of the costs of studies, planning, design, and construction of the multi-benefit project may be used for—
(i) quantified, significant safe drinking water benefits for low-income communities in accordance with subsection (f)(2)(A);
(ii) quantified, significant environmental benefits described in subsection (f)(3); or
(iii) a combination of the benefits described in clauses (i) and (ii).
(4) Agreement.—The project proponent or the Secretary, in the case of any Reclamation-led conveyance project that is a new project or involves a reserved works, shall enter into an agreement with 1 or more applicable stakeholders representing multi-benefit interests that describes the benefits authorized under paragraph (3)(B) proposed for the conveyance project.
(5) Form of non-federal share.—The non-Federal share of the cost of a conveyance project funded under this section may be in the form of—
(A) cash;
(B) in-kind contributions;
(C) reimbursable funding allocated pursuant to any statutory authority, if the eligible entity has entered into a repayment contract for the funding;
(D) a loan under the Water Infrastructure Finance and Innovation Act of 2014 (33 U.S.C. 3901 et seq.) or any other Federal loan program;
(E) amounts made available from a State revolving fund pursuant to the rules of the applicable State; or
(F) other non-Federal sources of funding, including State funding.
(f) Special Provisions Applicable to Multi-Benefit Projects.—
(1) Requirement.—
(A) In general.—A conveyance project with a total cost of not less than $800,000,000 that is funded under this section shall be a multi-benefit project.
(B) Less than $800,000,000.—The Secretary shall ensure that not less than 50 percent of conveyance projects with a total cost of less than $800,000,000 that are funded under this section shall be multi- benefit projects.
(2) Description of safe drinking water benefits for low- income communities.—
(A) In general.—The Federal funding for quantified, significant safe drinking water benefits for low-income communities referred to in subsection
(e)(3)(B)(i) may be provided—
(i) directly, by paying for a sufficient proportion of the capacity of the conveyance project (or, in the case of a conveyance project restoring the original capacity of a conveyance facility, paying for sufficient water from the conveyance project) and any additional infrastructure necessary to deliver safe drinking water to a low-income community or other resource or facility accessible to the community;
(ii) indirectly, by—
(I) supporting a low-income ratepayer assistance program for a project sponsor, a member agency of a project sponsor, or a drinking water district in the region of the conveyance project; or
(II) contributing to a Federal or State program that assists in delivering safe drinking water to low- income communities;
(iii) indirectly, by paying for a sufficient proportion of the project capacity during high-flow periods to provide a specific quantity of water (or, in the case of a conveyance project restoring the original capacity of a conveyance facility, paying for sufficient water from the conveyance project), with 1 of the project sponsors in return delivering the same quantity of water to the community through an exchange, banking water in a groundwater basin during times of excess for subsequent delivery to the low-income community;
(iv) indirectly, by paying for enhancement, repair, or upgrades to a Bureau of Indian Affairs conveyance facility in the region of the project;
(v) by any other direct or indirect means to provide safe drinking water to a low-income community; or
(vi) through a combination of the methods authorized under clauses (i) through (v).
(B) Delivery of water for drinking.—Delivery of water for drinking purposes shall be considered to be safe drinking water benefits for low-income communities for purposes of this section if—
(i) facilities exist to treat the water that is to become safe drinking water; or
(ii) the stakeholders representing the applicable low-income communities agree that there are viable plans and funding sources (including Federal or State funding) to treat the delivered water or exchanged water that is to become safe drinking water.
(C) Inclusion.—Any benefits described in subparagraph (A) that are safe drinking water benefits for low-income ratepayers shall be considered to meet the requirements for safe drinking water benefits for low-income communities under this section.
(D) Effect.—Nothing in this section requires a project proponent or project sponsor to pay for treatment of water delivered to low-income communities, other than low-income communities with which the project proponent or the project sponsor has an existing contractual relationship to deliver treated water.
(3) Description of environmental benefits.—The quantified, significant environmental benefits referred to in subsection
(e)(3)(B)(ii) include—
(A) benefits to a species listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) or other species of concern affected by operation of Reclamation projects or State or local water projects;
(B) additional flows to an inland water body, including the Great Salt Lake, either directly or indirectly through an exchange;
(C) benefits that improve aquatic or terrestrial habitats in the region of the proposed conveyance project;
(D) contributions to a Federal or State program that provides environmental benefits in the region of the project;
(E) delivery of additional water to wildlife refuges, either directly or indirectly through an exchange; or
(F) strategically designed actions that simultaneously achieve environmental and other benefits, such as habitat restoration or efforts to recover species that—
(i) improve the operation of the conveyance project; or
(ii) have water supply or flood protection benefits.
(4) Types of projects.—Of the multi-benefit projects funded under this section, the Secretary shall ensure that, to the maximum extent practicable—
(A) 50 percent provide at least some environmental benefits (or a combination of environmental benefits and safe drinking water benefits for low-income communities); and
(B) 50 percent provide at least some safe drinking water benefits for low-income communities (or a combination of safe drinking water benefits for low- income communities and environmental benefits).
(5) Phased funding of multi-benefit projects.—
(A) In general.—During the first 2 years in which a multi-benefit project is being constructed, the applicable project sponsor may apply for and receive Federal funds for construction costs authorized under subsection (e)(3)(A), subject to subparagraph (C).
(B) Design.—Subject to the provisions of this paragraph, to the maximum extent practicable, the project proponent shall seek to integrate environmental benefits and safe drinking water benefits for low- income communities into the design of the applicable multi-benefit project.
(C) Requirement.—To be eligible for Federal funds under subparagraph (A), the applicable project proponent shall—
(i) commit to include safe drinking water benefits for low-income communities or environmental benefits in the multi-benefit project on the date on which Federal funds are provided under that subparagraph;
(ii) demonstrate that the project sponsor is in negotiations to add multi-benefit project elements with stakeholders representing the environment or safe drinking water for low- income communities; and
(iii) not later than 2 years after the date on which the project sponsor first receives construction funding for the project under subsection (e)(3)(A), submit a proposal for additional funding under subsection (e)(3)(B) that is consistent with the applicable agreement entered into under subsection (e)(4).
(D) Required ratio.—
(i) In general.—Subject to clauses (ii) and (iii), on submission of a proposal for additional funding under subparagraph (C)(iii), for any subsequent 5-year period for which Federal funds are made available for the applicable multi-benefit project under this section—
(I) 60 percent shall be made available for costs relating to the benefits referred to in subsection
(e)(3)(A); and
(II) 40 percent shall be made available for costs relating to environmental benefits or safe drinking water benefits for low-income communities in accordance with this subsection.
(ii) Modification.—Notwithstanding clause
(i), the project proponent or the Secretary, in the case of any Reclamation-led conveyance project that is a new project or involves a reserved works, and any stakeholders representing multi-benefit interests subject to an agreement referred to in subsection (e)(4) may by mutual agreement modify the ratio of funding for different components of the conveyance project established under clause (i) for funding over the specified 5-year period.
(iii) Allocation of total funding.—The Secretary shall ensure that the total allocation of funding for a multi-benefit project shall reflect the ratio of funding established under clause (i).
(g) Criteria for Selecting Conveyance Projects.—In determining whether to select a conveyance project for a grant under this section, the Secretary shall consider—
(1) the Federal benefits of the conveyance project;
(2) whether the conveyance project, in the judgment of the Secretary, is well-designed to achieve the benefits of the conveyance project at a reasonable cost;
(3) whether the conveyance project meets a critical need at the national, State, regional, or local level;
(4) whether the conveyance project assists the Federal Government in honoring contracts of the Federal Government;
(5) diversity in the geography and size of conveyance projects; and
(6) such other factors as the Secretary determines appropriate.
(h) Total Dollar Cap.—The Secretary shall not impose a total dollar cap on Federal funds under this section for any individual conveyance project funded under the Program.
(i) New Conveyance Facility.—No Federal funds are authorized under this section for any new conveyance facility that costs more than $5,000,000,000.
(j) Reimbursability of Funds.—Any Federal funds provided by the Secretary under the Program shall be nonreimbursable to the United States, including—
(1) funding of Reclamation-led conveyance projects under subsection (c); and
(2) grants to eligible entities for non-Federal conveyance projects under subsection (d).
(k) Funding Eligibility.—A conveyance project shall not be considered ineligible for funding under the Program on the basis of the conveyance project receiving assistance under any other Federal funding program or Federal joint use agreement.
(l) Applicable Law.—A conveyance project funded under the Program shall be consistent with applicable Federal, State, and Tribal law.
(m) Authorization of Appropriations.—There is authorized to be appropriated to the Secretary to carry out this section $500,000,000 for the period of fiscal years 2028 through 2032.
SEC. 4. REAUTHORIZATION OF RECYCLING PROGRAM AND ENVIRONMENTAL RESTORATION PROGRAM.
(a) Authorization of New Water Recycling and Reuse Projects.— Section 1602(g) of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h(g)) is amended by striking paragraph (1) and inserting the following:
“(1) There is authorized to be appropriated to the Secretary of the Interior to carry out this section $550,000,000 for the period of fiscal years 2028 through 2032.”.
(b) Ceiling on Federal Share.—Section 1631(d)(1) of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h-13(d)(1)) is amended by striking “$20,000,000 (October 1996 prices)” and inserting “$50,000,000 (in December 2025 prices, as automatically adjusted each January based on the percentage increase in the consumer price index for all urban consumers (United States city average) over the previous year, as published by the Bureau of Labor Statistics)”.
(c) Actions for Benefit of Endangered Species, Important Habitat, and Water Bodies.—Section 4010(b) of the Water Infrastructure Improvements for the Nation Act (Public Law 114-322; 130 Stat. 1872) is amended by striking paragraph (2) and inserting the following:
“(2) Actions for benefit of endangered species, important habitat, and water bodies.—There is authorized to be appropriated to the Secretary of the Interior (acting through the Commissioner of Reclamation) $250,000,000 for the period of fiscal years 2028 through 2032—
“(A) for the restoration of habitat or improvement of conditions at the Great Salt Lake and other saline inland lakes affected by the operation of the Central Utah Project or Bureau of Reclamation water projects or deliveries;
“(B) for—
“(i) gravel and rearing area additions, fish passage improvements, barrier removal, and habitat restoration to the Sacramento River, its tributaries, or other rivers or river basins affected by the operation of Bureau of Reclamation facilities to benefit species listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), including Chinook salmon and steelhead trout;
“(ii) scientifically improved and increased real-time monitoring to inform real- time operations of Bureau of Reclamation facilities, and alternative methods, models, and equipment to improve temperature modeling, science, and monitoring to support flow benefits for fish species, and related forecasted information for purposes of predicting impacts to salmon, salmon habitat, species listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), or other species of concern as a result of water management at Bureau of Reclamation facilities;
“(iii) aquatic habitat restoration activities, including floodplain reconnection and reactivation projects (such as off-channel and managed floodplain inundation projects that enhance biological productivity and food web support for fish) that enhance the ability of the Bureau of Reclamation to meet contractual obligations for water deliveries;
“(iv) fish hatchery modernization and construction projects; and
“(v) structural or operational improvements, including temperature control and associated facilities, necessary to implement activities described in clauses (i) through
(iv); and
“(C) for planning, design, scientific studies, resource and biological monitoring, environmental reviews, permitting, construction, implementation, and adaptive management associated with any of the activities described in subparagraphs (A) and (B).”.
SEC. 5. OFFSET FROM EXTENSION OF CERTAIN PROVISIONS.
Section 4013 of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114-322) is amended—
(1) in paragraph (1), by striking “and” at the end;
(2) in paragraph (2), by striking “in” and inserting “under”;
(3) by redesignating paragraph (2) as paragraph (3); and
(4) by inserting after paragraph (1) the following:
“(2) section 4009(c), section 4010(b)(2), and subsections
(a), (b), (c), (d), and (f) of section 4011, which shall expire 15 years after that date of enactment; and”.
SEC. 6. DEAUTHORIZATION OF INACTIVE PROJECTS OFFSET.
(a) Purposes.—The purposes of this section are—
(1) to establish an efficient and transparent process for deauthorizing Reclamation projects that have failed to receive a minimum level of investment to ensure active Reclamation projects can move forward while reducing the backlog of authorized Reclamation projects; and
(2) to allow for exceptions for the deauthorization of Reclamation projects under paragraph (1) based on—
(A) action by Congress;
(B) funding to completion by the non-Federal project sponsor; or
(C) a finding by the Secretary that certain Reclamation projects should continue to be authorized to meet vitally important needs of a State or the United States.
(b) Definitions.—In this section:
(1) Reclamation project.—The term “Reclamation project” means a project that is—
(A) owned by the United States; and
(B) constructed and operated under the direction of the Bureau of Reclamation.
(2) Secretary.—The term “Secretary” means the Secretary of the Interior (acting through the Commissioner of Reclamation).
(c) Interim Deauthorization List.—Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives and make available on a publicly accessible internet website in a manner that is downloadable, searchable, and sortable—
(1) an interim deauthorization list of Reclamation projects—
(A) that are authorized; and
(B) for which funding was not obligated during the fiscal year in which this Act is enacted or any of the preceding 7 fiscal years; and
(2) for each Reclamation project listed under paragraph
(1)—
(A) the date of authorization of the Reclamation project, including any subsequent modifications to the original authorization;
(B) a brief description of the Reclamation project;
(C) the estimated cost of completion of the Reclamation project; and
(D) any remaining amounts authorized, but not appropriated, for the Reclamation project.
(d) Final Deauthorization List.—
(1) In general.—Not later than 1 year after the date on which the interim deauthorization list is submitted under subsection (c), the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives and make available on a publicly accessible internet website in a manner that is downloadable, searchable, and sortable, a final deauthorization list of all Reclamation projects identified in the interim deauthorization list, other than any Reclamation project—
(A) for which funding has been provided by an Act of Congress after the date of submission of the interim deauthorization list; or
(B) that the Secretary excludes under paragraph
(2).
(2) Exclusions.—The Secretary may exclude from the final deauthorization list under paragraph (1) a Reclamation project that the Secretary determines is vitally important for the interests of the United States or a particular State, based on consideration of the effects of the Reclamation project on—
(A) public health and safety;
(B) the economy; or
(C) the environment.
(e) Deauthorization; Congressional Review.—Effective beginning on the date that is 1 year after the date of submission of the final deauthorization list under subsection (d), a Reclamation project included on the final deauthorization list under that subsection is deauthorized, unless, prior to that date—
(1) a joint resolution disapproving the final deauthorization report is enacted into law;
(2) funding for the Reclamation project has been provided by an Act of Congress; or
(3) the non-Federal sponsor of the Reclamation project provides sufficient funds to complete the Reclamation project. <all>