Passed House Re-checks Congress.gov for new actions and updates the bill's status, and fills in any sponsors, committees, or related bills that are missing. It does not re-pull sponsors/cosponsors/committees/related — those rarely change — and it skips all work if nothing has changed upstream, so it's cheap to click.

Load Forecasting Enhancement Act

Introduced Jun 18, 2026

Latest action (Sep 16, 2026) Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Summary

  • Requires the Federal Energy Regulatory Commission, within 90 days of enactment, to establish regional joint boards that together cover every State, to study electric load forecasting.
  • Sets each joint board's membership as one representative from each State commission in its region, plus one FERC member who serves as chair, and ends each board when FERC submits its report.
  • Directs the boards to study forecasting best practices, including affordability, reliability, data and methodology transparency, stakeholder engagement, economic development projections, and evaluation of large industrial or commercial load requests.
  • Requires FERC to publish and submit to Congress, within one year of enactment, a report with the identified best practices and recommendations for their consistent use across States by electric utilities.
  • Adds a Public Utility Regulatory Policies Act standard requiring utility load forecasting procedures to incorporate the FERC report's recommendations, with State regulators required to consider the standard on set timelines and exempting nonregulated utilities from the consideration requirement.
  • Adds forecasting accuracy, oversight, and transparency procedures to the required contents of State energy conservation plans under the Energy Policy and Conservation Act.

AI-generated plain-language summary of the bill text — neutral, and may be imperfect. See the full text below for the exact wording.

Sponsor (1)

5 cosponsors

Actions (17)

  1. Sep 16, 2026 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. · senate
  2. Sep 15, 2026 Motion to reconsider laid on the table Agreed to without objection. · house
  3. Sep 15, 2026 On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H5663-5664) · house
  4. Sep 15, 2026 Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by voice vote.
  5. Sep 15, 2026 DEBATE - The House proceeded with forty minutes of debate on H.R. 9332. · house
  6. Sep 15, 2026 Considered under suspension of the rules. (consideration: CR H5663-5665) · house
  7. Sep 15, 2026 Mr. Guthrie moved to suspend the rules and pass the bill. · house
  8. Sep 14, 2026 Placed on the Union Calendar, Calendar No. 722. · house
  9. Sep 14, 2026 Reported by the Committee on Energy and Commerce. H. Rept. 119-823. · house
  10. Jul 21, 2026 Ordered to be Reported by the Yeas and Nays: 47 - 0. · house
  11. Jul 21, 2026 Committee Consideration and Mark-up Session Held · house
  12. Jul 20, 2026 Committee Consideration and Mark-up Session Held · house
  13. Jun 24, 2026 Forwarded by Subcommittee to Full Committee by Voice Vote. · house
  14. Jun 24, 2026 Subcommittee Consideration and Mark-up Session Held · house
  15. Jun 18, 2026 Referred to the Subcommittee on Energy. · house
  16. Jun 18, 2026 Referred to the House Committee on Energy and Commerce. · house
  17. Jun 18, 2026 Introduced in House

Full text

AN ACT

To require the Federal Energy Regulatory Commission to establish regional joint boards to study electric load forecasting, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the “Load Forecasting Enhancement Act”.

SEC. 2. REGIONAL JOINT BOARDS TO STUDY ELECTRIC LOAD FORECASTING.

(a) In General.—

(1) Establishment.—Not later than 90 days after the date of enactment of this Act, the Federal Energy Regulatory Commission shall establish—

(A) regions determined appropriate by the Commission for purposes of studying electric load forecasting; and

(B) a joint board for each such region.

(2) Regions.—In carrying out paragraph (1), the Commission shall ensure that each State is included in a region established under such paragraph.

(b) Membership.—Each joint board established under this section shall be composed of—

(1) 1 representative from each State commission in the region for which the joint board is established; and

(2) 1 member of the Commission, who shall serve as chair of the joint board.

(c) Duties.—Each joint board established under this section shall—

(1) study issues relevant to identifying best practices for electric load forecasting that enhance the reliability and affordability of electric service to customers in the region for which the joint board is established, including, with respect to the region for which the joint board is established—

(A) the effects of electric load forecasting on the affordability of electric service;

(B) the reliability and resilience of electric service;

(C) the methods used for collecting and modeling data relating to electric load forecasting;

(D) the transparency of the data and methodologies used to forecast electric loads and the accuracy of such forecasts;

(E) stakeholder engagement relating to electric load forecasting;

(F) economic development projections that may affect the electric load;

(G) the best available technologies, methodologies, and procedures for forecasting electric loads; and

(H) an evaluation of requests for electric service by industrial or commercial facilities with large loads, including whether such facilities have made financial commitments to an electric utility;

(2) identify such best practices; and

(3) report on such best practices to the Commission.

(d) Report to Congress.—Not later than 1 year after the date of enactment of this Act, the Commission shall publish and submit to Congress a report that includes—

(1) the best practices reported under subsection (c); and

(2) recommendations for the consistent use across States of any such best practices by electric utilities.

(e) Termination.—Each joint board established under this section shall terminate on the day after the date on which the Commission submits the report under subsection (d).

(f) Definitions.—In this section, the terms “electric utility”, “State”, and “State commission” have the meanings given such terms, respectively, in section 3 of the Federal Power Act (16 U.S.C. 796).

SEC. 3. PURPA STANDARD ON ELECTRIC LOAD FORECASTING.

(a) In General.—Section 111 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621) is amended—

(1) in subsection (d), by adding at the end the following:

“(22) Electric load forecasting.—The procedures used to forecast electric loads shall incorporate the recommendations published in the report of the Federal Energy Regulatory Commission pursuant to the Load Forecasting Enhancement Act.”; and

(2) by adding at the end the following:

“(e) Consideration and Determination by Nonregulated Electric Utilities.—The requirement for consideration and determination referred to in the first sentence of subsection (a) shall not apply to a nonregulated electric utility with respect to the standard established by paragraph (22) of subsection (d).”.

(b) Conforming Amendments.—

(1) Obligations to consider and determine.—Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended—

(A) in subsection (b), by adding at the end the following:

“(9)(A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d).

“(B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d).”;

(B) in subsection (c)—

(i) by striking “subsection (b)(2)” and inserting “subsection (b)”; and

(ii) by inserting “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).” after “paragraph (21).”; and

(C) by adding at the end the following:

“(i) Other Prior State Actions.—Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection—

“(1) the State has implemented for the electric utility the standard (or a comparable standard);

“(2) the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or

“(3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.”.

(2) Prior and pending proceedings.—Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by inserting “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of paragraph (22).” after “paragraph (21).”.

SEC. 4. STATE ENERGY CONSERVATION PLANS.

Section 362(c) of the Energy Policy and Conservation Act (42 U.S.C. 6322(c)) is amended—

(1) in paragraph (6), by striking “and” at the end;

(2) in paragraph (7), by striking the period at the end and inserting “; and”; and

(3) by adding at the end the following:

“(8) procedures and programs to improve the accuracy, oversight, and transparency to stakeholders of the forecasting of electric loads by electric utilities (as such term is defined in section 3 of the Federal Power Act (16 U.S.C.

796)).”.

Passed the House of Representatives September 15, 2026.

Attest:

Clerk. 119th CONGRESS

2d Session

H. R. 9332

AN ACT

To require the Federal Energy Regulatory Commission to establish regional joint boards to study electric load forecasting, and for other purposes.

Text versions (4)

  • Referred in Senate · Sep 16, 2026
  • Engrossed in House · Sep 15, 2026
  • Reported in House · Sep 14, 2026
  • Introduced in House · Jun 18, 2026