HR 3668 Passed House Re-checks Congress.gov for new actions and updates the bill's status, and fills in any sponsors, committees, or related bills that are missing. It does not re-pull sponsors/cosponsors/committees/related — those rarely change — and it skips all work if nothing has changed upstream, so it's cheap to click.
Improving Interagency Coordination for Pipeline Reviews Act
Summary
This bill streamlines the process for natural gas pipeline authorizations by designating the Federal Energy Regulatory Commission as the sole lead agency for environmental reviews required under the Natural Gas Act. The bill establishes timelines for identifying and coordinating with other federal, state, local, and tribal agencies that need to issue related authorizations or provide input. Other agencies must participate in the Commission's review process within established deadlines or lose the ability to conduct separate environmental reviews and submit comments on the record. The bill also sets deadlines for completing all federal authorizations within 90 days after the Commission completes its environmental review, with agencies required to report progress every 90 days and notify Congress of any missed deadlines.
AI-generated plain-language summary of the bill text — neutral, and may be imperfect. See the full text below for the exact wording.
Sponsor (1)
3 cosponsors
Actions (23)
- Dec 15, 2025 Received in the Senate and Read twice and referred to the Committee on Commerce, Science, and Transportation. · senate
- Dec 12, 2025 Motion to reconsider laid on the table Agreed to without objection. · house
- Dec 12, 2025 On passage Passed by the Yeas and Nays: 213 - 184 (Roll no. 334). (text: CR H5814-5816) · house
- Dec 12, 2025 Passed/agreed to in House: On passage Passed by the Yeas and Nays: 213 - 184 (Roll no. 334).
- Dec 12, 2025 On motion to recommit Failed by the Yeas and Nays: 194 - 204 (Roll no. 333). · house
- Dec 12, 2025 The previous question on the motion to recommit was ordered pursuant to clause 2(b) of rule XIX. · house
- Dec 12, 2025 Mr. Landsman moved to recommit to the Committee on Energy and Commerce. (text: CR H5820) · house
- Dec 12, 2025 The previous question was ordered pursuant to the rule. · house
- Dec 12, 2025 DEBATE - The House proceeded with one hour of debate on H.R. 3668. · house
- Dec 12, 2025 Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071. · house
- Dec 12, 2025 Considered under the provisions of rule H. Res. 936. (consideration: CR H5814-5822) · house
- Dec 9, 2025 Rules Committee Resolution H. Res. 936 Reported to House. Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071. · house
- Nov 25, 2025 Supplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-297, Part II. · house
- Sep 15, 2025 Placed on the Union Calendar, Calendar No. 253. · house
- Sep 15, 2025 Committee on Transportation discharged. · house
- Sep 15, 2025 Reported by the Committee on Energy and Commerce. H. Rept. 119-297, Part I. · house
- Jun 25, 2025 Ordered to be Reported by the Yeas and Nays: 27 - 23. · house
- Jun 25, 2025 Committee Consideration and Mark-up Session Held · house
- Jun 5, 2025 Forwarded by Subcommittee to Full Committee by the Yeas and Nays: 15 - 11. · house
- Jun 5, 2025 Subcommittee Consideration and Mark-up Session Held · house
- Jun 3, 2025 Referred to the Subcommittee on Energy. · house
- Jun 2, 2025 Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned. · house
- Jun 2, 2025 Introduced in House
How your representatives voted
Sign in to see how your own representatives voted on HR 3668.
Roll-call votes (2)
How the chamber voted on this bill — the outcome, the tally by party, and every member's recorded position. A factual record.
- On PassagePassed
213 Yea · 184 Nay · 36 Not voting
- Republicans36Yea1Nay
- Democrats2Yea21Nay5NV
The party tally and member list below cover the 65 of 433 positions we've recorded so far; the outcome above is the official chamber result.
See how each member voted (65)
Yea(38)
- August Pfluger
- Beth Van Duyne
- Brandon Gill
- Brian Babin
- Chip Roy
- Christopher H. Smith
- Craig A. Goldman
- Dan Crenshaw
- Daniel Meuser
- Glenn Thompson
- Guy Reschenthaler
- Henry Cuellar
- Jake Ellzey
- Jefferson Van Drew
- Jodey C. Arrington
- John Joyce
- John R. Carter
- Keith Self
- Lance Gooden
- Lloyd Smucker
- Michael Cloud
- Michael T. Mccaul
- Mike Kelly
- Monica De La Cruz
- Morgan Luttrell
- Nathaniel Moran
- Pat Fallon
- Pete Sessions
- Randy K. Sr. Weber
- Robert P. Bresnahan
- Roger Williams
- Ronny Jackson
- Ryan Mackenzie
- Scott Perry
- Thomas H. Kean
- Troy E. Nehls
- Vicente Gonzalez
- Wesley Hunt
Nay(22)
- Al Green
- Becca Balint
- Bonnie Watson Coleman
- Brian K. Fitzpatrick
- Chrissy Houlahan
- Christopher R. Deluzio
- Donald Norcross
- Dwight Evans
- Frank Pallone
- Herbert C. Conaway
- Joaquin Castro
- Josh Gottheimer
- Julie Johnson
- Lamonica Mciver
- Lizzie Fletcher
- Lloyd Doggett
- Madeleine Dean
- Mary Gay Scanlon
- Nellie Pou
- Robert Menendez
- Summer L. Lee
- Veronica Escobar
- On Motion to RecommitFailed
194 Yea · 204 Nay · 34 Not voting
- Republicans0Yea34Nay3NV
- Democrats23Yea0Nay5NV
The party tally and member list below cover the 65 of 432 positions we've recorded so far; the outcome above is the official chamber result.
See how each member voted (65)
Yea(23)
- Al Green
- Becca Balint
- Bonnie Watson Coleman
- Chrissy Houlahan
- Christopher R. Deluzio
- Donald Norcross
- Dwight Evans
- Frank Pallone
- Henry Cuellar
- Herbert C. Conaway
- Joaquin Castro
- Josh Gottheimer
- Julie Johnson
- Lamonica Mciver
- Lizzie Fletcher
- Lloyd Doggett
- Madeleine Dean
- Mary Gay Scanlon
- Nellie Pou
- Robert Menendez
- Summer L. Lee
- Veronica Escobar
- Vicente Gonzalez
Nay(34)
- August Pfluger
- Beth Van Duyne
- Brandon Gill
- Brian Babin
- Brian K. Fitzpatrick
- Christopher H. Smith
- Craig A. Goldman
- Daniel Meuser
- Glenn Thompson
- Guy Reschenthaler
- Jake Ellzey
- Jefferson Van Drew
- John Joyce
- John R. Carter
- Keith Self
- Lance Gooden
- Lloyd Smucker
- Michael Cloud
- Michael T. Mccaul
- Mike Kelly
- Monica De La Cruz
- Morgan Luttrell
- Nathaniel Moran
- Pat Fallon
- Pete Sessions
- Randy K. Sr. Weber
- Robert P. Bresnahan
- Roger Williams
- Ronny Jackson
- Ryan Mackenzie
- Scott Perry
- Thomas H. Kean
- Troy E. Nehls
- Wesley Hunt
More bills on these subjects (8)
Other bills that carry the most legislative subjects in common with this one (topical discovery — distinct from the procedural related bills above).
Similar bills (6)
Bills with similar text or summary — includes reintroductions across Congresses. Ranked by semantic similarity of the bill text (computed locally); a neutral discovery aid, not a claim the bills are duplicates.
Text versions (4)
Bills are re-published as they move (Introduced → Reported → Engrossed → Enrolled …). Each stage below is a separate text; pick two to see what changed. Data from Congress.gov.
Full text
AN ACT
To promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the “Improving Interagency Coordination for Pipeline Reviews Act”.
SEC. 2. PROMOTING INTERAGENCY COORDINATION FOR REVIEW OF NATURAL GAS PIPELINES.
(a) Definitions.—In this section:
(1) Commission.—The term “Commission” means the Federal Energy Regulatory Commission.
(2) Federal authorization.—The term “Federal authorization” has the meaning given that term in section 15(a) of the Natural Gas Act (15 U.S.C. 717n(a)).
(3) NEPA review.—The term “NEPA review” means the process of reviewing a proposed Federal action under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).
(4) Project-related nepa review.—The term “project- related NEPA review” means any NEPA review required to be conducted with respect to the issuance of an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act.
(b) Commission NEPA Review Responsibilities.—In acting as the lead agency under section 15(b)(1) of the Natural Gas Act for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall, in accordance with this section and other applicable Federal law—
(1) be the only lead agency;
(2) coordinate as early as practicable with each agency designated as a participating agency under subsection (d)(3) to ensure that the Commission develops information in conducting its project-related NEPA review that is usable by the participating agency in considering an aspect of an application for a Federal authorization for which the agency is responsible; and
(3) take such actions as are necessary and proper to facilitate the expeditious resolution of its project-related NEPA review.
(c) Deference to Commission.—In making a decision with respect to a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, each agency shall give deference, to the maximum extent authorized by law, to the scope of the project-related NEPA review that the Commission determines to be appropriate.
(d) Participating Agencies.—
(1) Identification.—The Commission shall identify, not later than 30 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, any Federal or State agency, local government, or Indian Tribe that may issue a Federal authorization or is required by Federal law to consult with the Commission in conjunction with the issuance of a Federal authorization required for such authorization or certificate.
(2) Invitation.—
(A) In general.—Not later than 45 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall invite any agency identified under paragraph (1) to participate in the review process for the applicable Federal authorization.
(B) Deadline.—An invitation issued under subparagraph (A) shall establish a deadline by which a response to the invitation shall be submitted to the Commission, which may be extended by the Commission for good cause.
(3) Designation as participating agencies.—Not later than 60 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall designate an agency identified under paragraph (1) as a participating agency with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act unless the agency informs the Commission, in writing, by the deadline established pursuant to paragraph (2)(B), that the agency—
(A) has no jurisdiction or authority with respect to the applicable Federal authorization;
(B) has no special expertise or information relevant to any project-related NEPA review; or
(C) does not intend to submit comments for the record for the project-related NEPA review conducted by the Commission.
(4) Effect of non-designation.—
(A) Effect on agency.—Any agency that is not designated as a participating agency under paragraph
(3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act may not request or conduct a NEPA review that is supplemental to the project-related NEPA review conducted by the Commission, unless the agency—
(i) demonstrates that such review is legally necessary for the agency to carry out responsibilities in considering an aspect of an application for a Federal authorization; and
(ii) requires information that could not have been obtained during the project-related NEPA review conducted by the Commission.
(B) Comments; record.—The Commission shall not, with respect to an agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act—
(i) consider any comments or other information submitted by such agency for the project-related NEPA review conducted by the Commission; or
(ii) include any such comments or other information in the record for such project- related NEPA review.
(e) Water Quality Impacts.—
(1) In general.—Notwithstanding section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341), an applicant for a Federal authorization shall not be required to provide a certification under such section with respect to the Federal authorization.
(2) Coordination.—With respect to any NEPA review for a Federal authorization to conduct an activity that will directly result in a discharge into the navigable waters (within the meaning of the Federal Water Pollution Control Act), the Commission shall identify as an agency under subsection (d)(1) the State in which the discharge originates or will originate, or, if appropriate, the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate.
(3) Proposed conditions.—A State or interstate agency designated as a participating agency pursuant to paragraph (2) may propose to the Commission terms or conditions for inclusion in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that the State or interstate agency determines are necessary to ensure that any activity described in paragraph
(2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act.
(4) Commission consideration of conditions.—The Commission may include a term or condition in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act proposed by a State or interstate agency under paragraph (3) only if the Commission finds that the term or condition is necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act.
(f) Schedule.—
(1) Deadline for federal authorizations.—A deadline for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act set by the Commission under section 15(c)(1) of such Act shall be not later than 90 days after the Commission completes its project-related NEPA review, unless an applicable schedule is otherwise established by Federal law.
(2) Concurrent reviews.—Each Federal and State agency—
(A) that may consider an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act shall formulate and implement a plan for administrative, policy, and procedural mechanisms to enable the agency to ensure completion of Federal authorizations in compliance with schedules established by the Commission under section 15(c)(1) of such Act; and
(B) in considering an aspect of an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, shall—
(i) formulate and implement a plan to enable the agency to comply with the schedule established by the Commission under section 15(c)(1) of such Act;
(ii) carry out the obligations of that agency under applicable law concurrently, and in conjunction with, the project-related NEPA review conducted by the Commission, and in compliance with the schedule established by the Commission under section 15(c)(1) of such Act, unless the agency notifies the Commission in writing that doing so would impair the ability of the agency to conduct needed analysis or otherwise carry out such obligations;
(iii) transmit to the Commission a statement—
(I) acknowledging receipt of the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act; and
(II) setting forth the plan formulated under clause (i) of this subparagraph;
(iv) not later than 30 days after the agency receives such application for a Federal authorization, transmit to the applicant a notice—
(I) indicating whether such application is ready for processing; and
(II) if such application is not ready for processing, that includes a comprehensive description of the information needed for the agency to determine that the application is ready for processing;
(v) determine that such application for a Federal authorization is ready for processing for purposes of clause (iv) if such application is sufficiently complete for the purposes of commencing consideration, regardless of whether supplemental information is necessary to enable the agency to complete the consideration required by law with respect to such application; and
(vi) not less often than once every 90 days, transmit to the Commission a report describing the progress made in considering such application for a Federal authorization.
(3) Failure to meet deadline.—If a Federal or State agency, including the Commission, fails to meet a deadline for a Federal authorization set forth in the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act, not later than 5 days after such deadline, the head of the relevant Federal agency (including, in the case of a failure by a State agency, the Federal agency overseeing the delegated authority) shall notify Congress and the Commission of such failure and set forth a recommended implementation plan to ensure completion of the action to which such deadline applied.
(g) Consideration of Applications for Federal Authorization.—
(1) Issue identification and resolution.—
(A) Identification.—Federal and State agencies that may consider an aspect of an application for a Federal authorization shall identify, as early as possible, any issues of concern that may delay or prevent an agency from working with the Commission to resolve such issues and granting such authorization.
(B) Issue resolution.—The Commission may forward any issue of concern identified under subparagraph (A) to the heads of the relevant agencies (including, in the case of an issue of concern that is a failure by a State agency, the Federal agency overseeing the delegated authority, if applicable) for resolution.
(2) Remote surveys.—If a Federal or State agency considering an aspect of an application for a Federal authorization requires the person applying for such authorization to submit data, the agency shall consider any such data gathered by aerial or other remote means that the person submits. The agency may grant a conditional approval for the Federal authorization based on data gathered by aerial or remote means, conditioned on the verification of such data by subsequent onsite inspection.
(3) Application processing.—The Commission, and Federal and State agencies, may allow a person applying for a Federal authorization to fund a third-party contractor to assist in reviewing the application for such authorization.
(h) Accountability, Transparency, Efficiency.—For an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that requires multiple Federal authorizations, the Commission, with input from any Federal or State agency considering an aspect of the application, shall track and make available to the public on the Commission’s website information related to the actions required to complete the Federal authorizations. Such information shall include the following:
(1) The schedule established by the Commission under section 15(c)(1) of the Natural Gas Act.
(2) A list of all the actions required by each applicable agency to complete permitting, reviews, and other actions necessary to obtain a final decision on the application.
(3) The expected completion date for each such action.
(4) A point of contact at the agency responsible for each such action.
(5) In the event that an action is still pending as of the expected date of completion, a brief explanation of the reasons for the delay.
(i) Pipeline Security.—In considering an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Federal Energy Regulatory Commission shall consult with the Administrator of the Transportation Security Administration regarding the applicant’s compliance with security guidance and best practice recommendations of the Administration regarding pipeline infrastructure security, pipeline cybersecurity, pipeline personnel security, and other pipeline security measures.
Passed the House of Representatives December 12, 2025.
Attest:
Clerk. 119th CONGRESS
1st Session
H. R. 3668
AN ACT
To promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.
Comments