Introduced Re-checks Congress.gov for new actions and updates the bill's status, and fills in any sponsors, committees, or related bills that are missing. It does not re-pull sponsors/cosponsors/committees/related — those rarely change — and it skips all work if nothing has changed upstream, so it's cheap to click.

Ocean Pollution Reduction Act II

To modify permitting requirements with respect to the discharge of any pollutant from the Point Loma Wastewater Treatment Plant in certain circumstances, and for other purposes.

Introduced Feb 14, 2025

Latest action (Feb 14, 2025) Referred to the Subcommittee on Water Resources and Environment.

Issues
Climate & Energy

Summary

This bill modifies permitting requirements for the Point Loma Wastewater Treatment Plant in San Diego to allow discharge of treated wastewater into ocean waters under specific conditions. The bill requires the plant to maintain its deep ocean outfall at a depth of at least 300 feet and at least 4 miles from shore. The bill establishes discharge limits for total suspended solids that decline over time: not more than 12,000 metric tons per year initially, reducing to 11,500 metric tons per year by 2029 and 9,942 metric tons per year by 2031. The bill requires the plant to achieve at least 80 percent removal of total suspended solids and 58 percent removal of biochemical oxygen demand, maintain ocean monitoring programs, and work toward producing at least 83 million gallons per day of water suitable for potable reuse by 2039. The bill requires California state concurrence and EPA oversight of all permitting and monitoring requirements.

AI-generated plain-language summary of the bill text — neutral, and may be imperfect. See the full text below for the exact wording.

Sponsor (1)

Money behind the sponsor

Top reported contributors to Scott H. Peters’s campaign committee (2024 cycle) — who funds the bill’s sponsor, not a claim about this bill. Data from FEC.

  • RA CAPITAL MANAGEMENT $19,800
  • BLACKSTONE $17,500
  • GENERAL ATOMICS $15,400
  • QUALCOMM $13,300
  • RA CAPITAL $13,200

Organizations whose employees gave the most — itemized individual contributions grouped by the donor’s reported employer (FEC Schedule A). Full finance for Scott H. Peters → · Outside spending →

Actions (3)

  1. Feb 14, 2025 Referred to the Subcommittee on Water Resources and Environment. · house
  2. Feb 14, 2025 Referred to the House Committee on Transportation and Infrastructure. · house
  3. Feb 14, 2025 Introduced in House

Similar bills (6)

Bills with similar text or summary — includes reintroductions across Congresses. Ranked by semantic similarity of the bill text (computed locally); a neutral discovery aid, not a claim the bills are duplicates.

Text versions (1)

  • Introduced in House · Feb 14, 2025

Only one text version is on file, so there’s no earlier version to compare against yet.

Full text

IN THE HOUSE OF REPRESENTATIVES

February 14, 2025

Mr. Peters (for himself, Mr. Levin, Mr. Vargas, Mr. Issa, and Ms. Jacobs) introduced the following bill; which was referred to the Committee on Transportation and Infrastructure

A BILL

To modify permitting requirements with respect to the discharge of any pollutant from the Point Loma Wastewater Treatment Plant in certain circumstances, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the “Ocean Pollution Reduction Act II”.

SEC. 2. SAN DIEGO POINT LOMA PERMITTING REQUIREMENTS.

(a) In General.—Notwithstanding any provision of the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq.), the Administrator may issue a permit under section 402 of the Federal Water Pollution Control Act (33 U.S.C. 1342) for a discharge from the Point Loma Plant into marine waters that requires compliance with the requirements described in subsection (b).

(b) Conditions.—A permit issued under this section shall require—

(1) maintenance of the currently designed deep ocean outfall from the Point Loma Plant with a discharge depth of not less than 300 feet and distance from the shore of not less than 4 miles;

(2) as applicable to the term of the permit, discharge of not more than 12,000 metric tons of total suspended solids per year commencing on the date of enactment of this section, not more than 11,500 metric tons of total suspended solids per year commencing on December 31, 2029, and not more than 9,942 metric tons of total suspended solids per year commencing on December 31, 2031;

(3) discharge of not more than 60 milligrams per liter of total suspended solids, calculated as a 30-day average;

(4) removal of not less than 80 percent of total suspended solids on a monthly average and not less than 58 percent of biochemical oxygen demand on an annual average, taking into account removal occurring at all treatment processes for wastewater upstream from and at the Point Loma Plant;

(5) attainment of all other effluent limitations of secondary treatment as determined by the Administrator pursuant to section 304(d)(1) of the Federal Water Pollution Control Act (33 U.S.C. 1314(d)(1)), other than any requirements otherwise applicable to the discharge of biochemical oxygen demand and total suspended solids;

(6) compliance with the requirements applicable to Federal issuance of a permit under section 402 of the Federal Water Pollution Control Act, including State concurrence consistent with section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341) and ocean discharge criteria evaluation pursuant to section 403 of the Federal Water Pollution Control Act (33 U.S.C. 1343);

(7) implementation of the pretreatment program requirements of paragraphs (5) and (6) of section 301(h) of the Federal Water Pollution Control Act (33 U.S.C. 1311(h)) in addition to the requirements of section 402(b)(8) of such Act (33 U.S.C. 1342(b)(8));

(8) that the applicant provide 10 consecutive years of ocean monitoring data and analysis for the period immediately preceding the date of each application for a permit under this section sufficient to demonstrate to the satisfaction of the Administrator that the discharge of pollutants pursuant to a permit issued under this section will meet the requirements of section 301(h)(2) of the Federal Water Pollution Control Act (33 U.S.C. 1311(h)(2)) and that the applicant has established and will maintain throughout the permit term an ocean monitoring program that meets or exceeds the requirements of section 301(h)(3) of such Act (33 U.S.C. 1311(h)(3)); and

(9) to the extent potable reuse is permitted by Federal and State regulatory agencies, that the applicant demonstrate that at least 83,000,000 gallons per day on an annual average of water suitable for potable reuse will be produced by December 31, 2039, taking into account production of water suitable for potable reuse occurring at all treatment processes for wastewater upstream from and at the Point Loma Plant.

(c) Milestones.—The Administrator shall determine development milestones necessary to ensure compliance with this section and include such milestones as conditions in each permit issued under this section before December 31, 2039.

(d) Secondary Treatment.—Nothing in this section prevents the applicant from alternatively submitting an application for the Point Loma Plant that complies with secondary treatment pursuant to section 301(b)(1)(B) and section 402 of the Federal Water Pollution Control Act (33 U.S.C. 1311(b)(1)(B); 33 U.S.C. 1342).

(e) Definitions.—In this section:

(1) Administrator.—The term “Administrator” means the Administrator of the Environmental Protection Agency.

(2) Biochemical oxygen demand.—The term “biochemical oxygen demand” means biological oxygen demand, as such term is used in the Federal Water Pollution Control Act.

(3) Point loma plant.—The term “Point Loma Plant” means the Point Loma Wastewater Treatment Plant owned by the City of San Diego on the date of enactment of this Act.

(4) State.—The term “State” means the State of California. <all>